spacer.gif
Blog

Unexpected Work

My current shop is in a 6800 square foot building I built about seven years ago. When I built the building Strong Frames was a much larger company and I included a store front that I intended to use for a bike shop which I ran for two years called Stark Raven Cycles. You can get the whole story by following the tour of my history here: History. At any rate, to make a long story short, I have since split the space into four separate commercial units of which I occupy one and the three others are rented.

MVC-001S

Last October my big tenant moved out leaving a lot of my space vacant. Since then I’ve had one tenant move in and bail, and three others make verbal commitments but none completed the transaction. Well finally last week I had a tenant come along for the store front who signed a lease and was ready to move it. The catch was she wanted to open for business today. She has a 10 year old business downtown and due to circumstances beyond her control needed to move her business and move it fast. I’ve been in her shoes before and I know how expensive down time can be.  There were a few modifications that needed to be done to the space before she moved in but no contractors could get here in time so I did it myself. Fortunately it’s a skill set I have.

So last week I spent Wed-Fri building, and finishing some partition walls. Obviously since I was next door building walls (Strong Custom Walls?) I wasnt’ building frames. I’ll be back on track this week and for those of you waiting to see your frames on the blog keep your eyes open, they’ll be  coming soon.

This entry was posted on Monday, August 31st, 2009 at 4:50 am and is filed under Uncategorized. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

Leave a Reply

Spam Protection by WP-SpamFree

int_copy_bottom.png